Assignor: Arteks Engineering AD
Project: Mechanized vertical drilling of steel profiles.
Executor: Vidritsa EOOD
Assignor: Bul Rent Sofia AD
Project: Mechanized demolition of two-storey building and transportation of construction waste to regulated landfill.
Executor: Vidritsa EOOD
Assignor: Avtomagistrali EAD
Project: Mechanized demolition of the tertiary tunnel lining of Vitinya tunnel, right pipe of Hemus Highway – 720 linear meters; demolition of existing sidewalks by the tertiary tunnel lining of Vitinya tunnel, right pipe of Hemus Highway of length 720 linear meters; clearing and removal of the present hydro-insulation system of the removed tertiary tunnel lining of size 16560 m2 , including transportation of demolished material to a landfill and crushing it to a fraction of size 0-70mm.
Executor: Vidritsa EOOD